You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran di Jalan Pasar Baru Timur Dilanjutkan

Drainage Construction on Jalan Pasar Baru Timur Continued

Central Jakarta Water Resources (SDA) Sub-agency continues water channel construction work on Jalan Pasar Baru Timur, Pasar Baru Urban Village, Sawah Besar.

We are targeting to complete channel on Jalan Pasar Baru Timur in April

Central Jakarta SDA Sub-agency's Drainage Channel Maintenance Section Head, Glen Santista mentioned, construction of 400-meter water channel is expected to minimize inundation on Jalan Pasar Baru area which often occurs during heavy rain.

"This construction work is the continuation from program in 2020 which is considered successful in overcoming inundation in the region," he added, Wednesday (3/3).

Damaged Gutters in Kota Tua Area Being Repaired

Last year, his side built 500-meter channel with depth of 1 meters on Jalan Pasar Baru Timur. This channel was built to hold rainwater and flow it into stilling basin.

"Water in stilling basin will be drained using pump to Ciliwung River," he informed.

His side has coordinated with City Park and Forestry Sub-agency to take care of trees affected by channel construction.

"We are targeting to complete channel on Jalan Pasar Baru Timur in April," he closed.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye535 personDessy Suciati
  2. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye524 personAldi Geri Lumban Tobing
  3. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye523 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye515 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye504 personNurito